The journal version expands the conference paper with additional modelling details, parameter justification and comparative 2D–3D analyses. Reyes and Parra discuss practical challenges in defining representative 2D sections for complex mine waste geometries and highlight how 3D column-based procedures better reflect real failure surfaces. The study provides a methodological benchmark for 3D geotechnical practice in mining.
